Micropiles.

Micropiles are deep foundations with a small diameter. They may be installed in a variety of ways and have several purposes. Bedenis et al. (2004) describe the use of micropiles as load-bearing elements to strengthen foundations that were to support a greater load. The piles were installed by drilling, and were employed because pile-installation equipment could not be operated in the available space inside the building. The piles consisted of a high-strength steel bar with a diameter ranging in size from 32 to 63 mm, grouted into place,
and forming a pile 152 mm in diameter. The piles extended through overburden soils to sandstone at a depth of 24.7 m. The capacity was developed principally through side resistance in the sandstone.

Go ´mez et al. (2003) describe the testing of a micropile with a diameter of 219 mm and a length of 7.13 m, consisting of a central casing with a diameter of 178 mm that was embedded in grout. The soil at the test site consisted of 3.0 meters of residual soil above rock. The instrumentation revealed that the bond between the rock and the grout did not fail, but some loss of load transfer in skin friction was noted as the movement of the pile relative to the soil increased above 0.05 mm.

If micropiles are used to sustain compressive loads, the engineer should compute the buckling load by using a computer code. The unfactored lateral load should be applied, and the compressive load is increased in increments until failure occurs by excessive lateral deflection. Pile-head fixity must be modeled as well as possible or the analyses should be performed with a range of pile-head fixities that encompass the value to be anticipated.

GeoJet Piles.

The GeoJet pile is described as an example of a special kind of deep foundation. Numerous kinds of special deep foundations have been developed and employed in some projects. The engineer faces the problems of designing for the support of axial and lateral loading and of preparing specifications for construction that allow for inspection to ensure good quality. With regard to design, the properties of the soil will be affected by the method of installation.

Therefore, the engineer must depend heavily on the results of load tests with the special foundation at the site or as reported in the technical literature where all relevant details are presented.

The GeoJet pile is constructed by rotating a special drilling head into the soil and introducing grout through the drilling head during withdrawal. Figure 5.8 shows a typical drilling head attached to a kelly prior to initiating construction at a site. If construction conditions are favorable, the column of soil cement can be constructed in less than 5 minutes. After the column of fluid soil-cement is created, a steel insert, such as a pipe, is placed to the full depth of the pile by gravity with minor driving. Tests of samples of soil-cement
made with the soil from the construction site lead to the desirable percentage of cement to give the soil-cement the necessary strength and the desirable percentage of water so that the steel insert can fall under its own weight. The concept employed in construction is that sensors in the system will provide data to a computer on the specific gravity of the grout, the amount of grout being pumped, the measurements of pressures at points in the system, the rate of rotation of the auger, and the force encountered in drilling. A printed record may be made showing relevant data as a function of depth. The record is valuable in evaluating the quality of the construction.

Some data have been collected on load tests with piles constructed by the GeoJet system, but the concept of design is that pile tests are performed at a site with designs of soil-cement based on the tests noted above. Some data have been collected on GeoJet piles that have been tested (Spear et al., 1994; Reavis et al., 1995).
Figure 5.8 Drilling head used in construction of the GeoJet pile.

Augercast Piles.

Augercast piles (also known as augered-cast-in-place piles) are constructed by turning a continuous-flight auger with a hollow stem into the soil. On reaching the desired depth, grout is pumped through the hollow stem as the auger is withdrawn, forming a column of fluid grout. A short rebar cage can be set by gravity or sometimes by the use of vibration. In addition, if desired, a single rebar can be placed in the hollow stem before grout is pumped. These piles are termed continuous-flight-auger (CFA) piles in Europe and have re-
ceived wide acceptance there and elsewhere.

Among the construction problems that have been encountered with the use of augercast piles are the sudden retrieval of the auger, allowing the soil to squeeze in and cause a neck in the pile; the continued rotation of the auger after it reaches the desired depth, with the result that soil is ‘‘mined’’; and upward flow of water around the sides of a pile or through the center opening when installations occur where the water table is high. The mining of soil during drilling by an unqualified or careless workman can lead to a collapse of the ground surface in the area around the pile. Some problems can be eliminated by the use of instruments on the drilling machine. Such instruments produce a record showing the rate of rotation of the auger as a function of depth and the amount of grout that is pumped as a function of the depth of the auger.


Loss of ground due to mining of subsurface soils is more of a problem when constructing an augercast pile in sand than in clay. Some engineers are reluctant to specify the use of augercast piles in sand unless careful inspection is programmed.

A potential problem with augercast piles is possible eccentricity during the application of loading (Siegel and Mackiewitz, 2003). This problem may arise because of the lack of reinforcement except for the short cage near the top of the pile and a single bar along the axis.

Lacy et al. (1994) have discussed the use of augercast piles to reduce or eliminate the impact on adjacent structures. Driving piles will cause vibration that can affect nearby structures and can also cause the settlement of deposits of loose sand that can potentially cause great damage to structures in an urban
setting. Augercast piles have proved to be very useful in some settings, but construction must be monitored carefully to ensure a sound and competent foundation.

One of the authors has observed the use of CFA piles in the overconsoli- dated clay near London. The drilling rigs are invariably instrumented, and axial-load tests are frequently performed at a site to prove the quality of the construction and to confirm the results of the analyses of axial capacity. The system for testing the pile is often controlled by a computer, and the working load can be confirmed by maintaining the load overnight or longer without the presence of a technician.

Driven Piles with Impact Hammer.

The engineer frequently makes an extensive and thorough investigation prior to selecting of the type and configuration of a pile for a particular project.

The pile must sustain the expected loadings with appropriate safety, and con- struction must be accomplished in a timely manner while complying with local regulations. In some cities, for example, noise is a major concern and regulations may preclude the use of many driven piles. The types of piles and the factors affecting the selection of a particular pile are noted in the following discussion.

Several later chapters address methods for computing the axial and lateral capacity of a pile. The piles may be timber, reinforced concrete, prestressed concrete, structural-steel shapes, steel pipe, or a tapered-steel pipe. The engineer selects the pile type and hammer on the basis of (1) loads to be supported, (2) tolerance of the superstructure to differential settlement, (3) expected life of the project, (4) availability of materials and construction machinery, (5) length of time required for installation, (6) difficulty of construction, (7) ability to make a proper inspection, (8) noise during construction, and (9) cost.

Environmental effects on the material composing the pile must be considered. Steel in some environments will be subjected to corrosion. In offshore practice, some piles may extend through the splash zone, where corrosion must be considered. Two procedures are common: extra-thick steel may be provided to account for progressive loss of the steel with time or a form of cathodic protection may be provided. Timber piles can be treated with creosote to prevent attack from insects, but this does not prevent damage from certain species of marine borers (Grand, 1970). And, as discussed below, special care must be employed in driving reinforced concrete piles to prevent cracking that could lead later to failure due to corrosion of the rebars.
The engineer may need to consider the drift of driven piles during installation. The tips of the piles in a group may move close to each other at full penetration and may actually touch each other during driving. The bending stiffness of the piles relative to the stiffness of the soil and the position of the head of the pile are factors that affect the drift. The closeness of the piles after installation may or may not affect their ability to sustain loading. If the final positions of the piles in a group are important, the engineer may stipulate that preboring be employed.

A large variety of impact hammers are available up to the size required for driving very long piles and down to the smallest that can be driven.

Hammers may be drop-weight, diesel, single-acting steam, or double-acting steam

The structural engineer and the geotechnical engineer may cooperate in studying the relative advantage of a small number of larger piles and a large number of smaller piles. The selection may be dictated by local construction practice.

With the preliminary selection of a pile, an appropriate computer code should be employed in matching the hammer and cushioning to the pile. The cushioning material may be some form of plastic, or wood of various sorts.

Plywood sheets are frequently used as cushioning. The computer code models a compressive wave yielding stress versus time, generated by the impact of the hammer, taking the cushioning into account. The wave travels down the pile and is reflected at the pile tip. For driving against bedrock, a compressive wave is reflected. For driving against very weak soil at the tip, the wave is reflected as a tensile wave. Tension in a reinforced concrete pile can cause cracking that could result in penetration of water, leading to corrosion. Some reinforced concrete piles under bridges have been so damaged due to tensile cracks as to need replacement.

The proper cushion is important. The authors were asked to review a project where the cushioning was provided by sheets of plywood. The plywood was replaced irregularly and actually caught fire on occasion. The result was cracking of some of the reinforced concrete piles due to compressive forces.

One of the authors participated in driving an instrumented, closed-ended steel pipe with a diameter of 6 in. A blow from a drop hammer caused the pile to move down in soft clay but with very little permanent set. Persistent driving was damaging the instrumentation, and the decision was made to use a coiled spring from a rail car as the cushioning. The pile drove readily, with no damage to the instrumentation. The decision to use the soft cushion was made by judgment, but the implementation of a computer code to model the
pile driving would have been useful.

An impact hammer resting on a driven pile is shown in Figure 5.3. A continuous-flight auger is shown that can be used to predrill a small-diameter hole to a given distance to ease the driving into some formations. The photograph shows disturbance to the soil in the vicinity of the pile, which must be considered when computing pile capacity. Vibrations and soil movement due to pile driving can cause severe damage to existing structures and has been investigated in detail (Lacy and Gould, 1985; Lacy and Moskowitz,
1993; Lacy, et al, 1994; Lacy, 1998).

Some piles are driven with vibratory hammers, principally steel sheet piles used for retaining structures. Bearing piles are installed with vibratory techniques in some soils, and vibratory methods are frequently used to pull casings that were installed for the construction of drilled shafts. Vibratory hammers are less noisy than impact hammers and can result in less movement of the soil when driving into some sands.